تحديث...
Saudi Aramco
يجب أن تسجل الدخول قبل التقديم على الوظائف.

Scheduling Engineer

الوصف ومتطلبات الوظيفة

As the successful candidate you will hold a Bachelor’s Degree (BS) in Engineering or a BS Project & Construction Management from a recognized and approved program. 

You will have a total of 12 years’ experience with at least 10 years’ Experience specifically performing the development of baseline critical path schedules (Using ORACLE Primavera software version 15.2 or later) and progress measurement systems in order to plan, update, track, analyze and report WORK performance for all phases of the project.

This includes working with Design Consultants to create Level III EPC schedules for use to prepare plans to commence measuring and reporting WORK for projects, developing Bid Schedule criteria and requirements as part of the specific instructions to bidders, as well as, assisting Contractors awarded WORKS to develop detailed Level IV baseline schedules.

Duties & Responsibilities:
Candidate will be able to perform the following:

Demonstrate high skill in developing baseline critical path schedules

You will be highly skilled with resource loaded schedules in order to ensure standards of productivity are utilized in the schedule

You will have the ability to collect all timing data in order to plan and schedule the full scope of WORK

Expert skills in using the ORACLE Primavera software versions 15.2 or later working with Design Consultants and Engineering, Procurement and Construction Contractors in developing baseline critical path schedules and progress measurement systems is a requirement

You will have the ability to create a WBS that contractors can use to develop their baseline schedules and progress measurement systems that enables subsequent reporting in the Saudi Aramco systems

Understanding and following schedule management best practices

Preparing all presentation materials to convey the plans and schedules to the project team and stakeholders is a necessity

Assisting the project team with evaluation of reported progress and status of critical activities with particular attention to deviations from planned activities

Participate in project team meetings including financial forecasting session to ensure schedule and cost alignment

Assist cost engineers with timing information in order for cost forecasting accuracy

Understand cost weightings as it applies to progress systems for reporting weighted progress reports

Highly skilled to interface with the various stakeholders on the project team and other key stakeholders to receive the information required for accurate and timely critical-path management of the project schedules.

Updating, revising and detailing schedules as projects progress through development and execution stages including updating the schedules based on earned-value data from the Field Construction Analysts and other sources of construction tracking and reporting information

It is preferred that you have advanced skills in problem solving such as “What-If” scenario planning to assist in schedule slippage towards recovery

Developing and recording the project's historical schedule information and lessons learned to be used in closeout and for future use